刷题刷出新高度,偷偷领先!偷偷领先!偷偷领先! 关注我们,悄悄成为最优秀的自己!

单选题

Passage 2

    Questions 6 to 10 are based on the following passage:

    Toronto's third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.

    Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.

    Lennox took three years to design the City Hall and it took 11 years to build it.  Contemporaries believe that the odd carvings (雕刻) above the Queen Street entrance were actually caricatures (漫画) of councilors at the time.

    Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the  link portions of the building.

    The third City Hall was originally used as councilors' offices and legal offices, but it is used only as a courthouse today.

    When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall. "

    The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.

    (78) The entire structure cost more than $2.5 million to build at the time. This is equal to $53 million today.


Toronto's third City Hall came into use in__ .

A
the 18th century
B
the 19th century
C
the 20th century
D
the 21st century
使用微信搜索喵呜刷题,轻松应对考试!

答案:

B

解析:

题目:多伦多的第三个市政厅投入使用。

A:18世纪

B:19世纪

C:20世纪

D:21世纪

创作类型:
原创

本文链接:Toronto's third City Hall came into use in__ .

版权声明:本站点所有文章除特别声明外,均采用 CC BY-NC-SA 4.0 许可协议。转载请注明文章出处。

让学习像火箭一样快速,微信扫码,获取考试解析、体验刷题服务,开启你的学习加速器!

分享考题
share